AI data center map: sites, capacity and water stress | OpenButterfly
An analysis of global AI data center sites reveals a total planned capacity of 43.6 GW across 217 sites, with 158 sites currently operational. The data indicates that 68 of these sites are located in river basins facing high or extremely high baseline water stress. The tracker categorizes infrastructure by status, explicit AI purpose, and environmental factors using public sources. Open article →